To supply and install for Sacrificial Anode System for Gas Distribution System to Prestige Ceramics Sdn Bhd, Puchong, Selangor. 1995
To supply and install CP System for Mobil Tank Farm Kuantan Extension. 1995
Supply, install & commissioning of CP System for Tidal Gate, Kemasin. 1995
Supply, install & commissioning of CP System for Penang Island Water Supply Project (Twin Submarine 44” O.D. Steel Pipeline). 1995
Supply, install & commissioning of CP System for underground pipeline at Prai Sitt Tatt. 1995
Supply, install & commissioning of Sacrificial Magnesium Anode System for Amoco H2 Pipeline at Kuantan. 1995
Supply, install & commissioning of CP System for Underground Fuel Piping & Fuel Storage Tanks, KLIA project. 1996
Supply, install & commissioning of CP System (Magnesium Ribbon) for underground Storage tanks, PFI Labuan Project. 1996
Supply, install and commissioning of CP System for Fuel Hydrant Pipeline at Penang Airport, Penang.  1996
Supply, install and commissioning of CP System for:a) MOX pipeline in Johore Bahru.

b) Underground tanks in Port Dickson Resort.

1996
Supply, install and commissioning of CP System for:a) 7.5 KL underground tank at Kijal, Terengganu.

b) LPG underground tank at Bangi (10KL)

1996
Supply, install and commissioning of CP System for NGV Service Station:a) Petronas – Damansara Jaya.

b) Petronas – Taman Sri Hartamas.

c) Shell – Kelana Jaya.

d) Shell – Section 17, P.J.

1996
Supply, install & commissioning of Sacrificial Anode System for Lateral Gas Pipeline System to:a) TPG – FLI (Telok Panglima Garang) Kuala Langat.

b) Idemitsu Chemicals (M) Sdn Bhd, Pasir Gudang.

c) Bintulu Silica Industries Sdn Bhd, Bintulu.

d) Teluk Kalong FL II, Kemaman, Kuantan.

e) Scott Paper, Kluang.

f) Pasir Gudang DL4 (Ph1), Johor.

g) Petronas Gas Close Internal Potential Survey PGU III

Sector 1 Mainline & Lateral Pipeline System from Meru

to Lumut, Perak.

h) Gas Pipeline Rectification Works, Port Dickson.

1996
Supply, install and commissioning of Sacrificial Anode System for underground tanks. 1995/96
PEPI LPG Import Terminal & Bottling Plant – Iligan, Philippines. 1996/97
Semi annual CP System survey on LNG Jetty, Berth, Bintulu, Sarawak.  1997
1) Eastman Chemical Sdn Bhd, Gebeng, Kuantan2) Kaneka, Gebeng, Kuantan. 1997
Gas Distribution System to PITT Senawang, Seremban. 1997
Industrial Gases Pipeline for Sitt Tatt Plant at Kulim Hi-Tech Park, Kulim, Kedah. 1997
450mm diameter MSCL pipeline (1.7km) in Kota Kinabalu – Immediate Work for the water supply system in Sabah. 1997
Langkawi Jetty, Tanjung Lembang Fasa 1, Bukit Malut, Pulau Langkawi. 1997
All major petrol stations in Peninsular Malaysia.  1997
CP Potential Survey & Cover Inspection on PGB pipeline at The Straits of Johore. 1997
1) Sheraton Tower, K.L.2) Underground tank at Kuantan

3) Bukit Raja

1997
Localised protection along sector 3 (from Segamat to Pasir Gudang) Gas Pipeline System. 1997
1) Bukit Raja2) EPCC of gas pipeline relocation for section 2, 3 & 4

Damansara-Puchong Highway.

1997
1) NGDS to MRCB, Puchong Batu 13.2) Beloga Sdn Bhd & Maxter Glove Sdn Bhd, Meru.

 

1997
1) NGDS to Mandarin Hotel, K.L.2) Petronas NGV station, Kelana Jaya, P.J. 1997
Close Interval Potential Survey on Multi-products Pipeline Project. (from Melaka-Puchong) 1997
NGDS to Grand Hdyat Duta Hotel. 1997
Underground pipeline in KLIA, Sepang. 1997
CMS underground pipeline at Bintulu, Sarawak. (NPS 14”/960m) 1997/98
Gas Distribution Pipeline System to Public Holding Sdn Bhd, Bangi. 1997/98
840mm (steel) Pumping Main From Raw Water Intake No. 1 to Batu Kitang Treatment Plant No. 1, Kuching, Sarawak. 1998
The Construction and Completion of Proposed Sungai Sarawak Causeway to Sungai Sarawak Regulation Scheme, Kuching, Sarawak. 1998
Soil Resistivity Survey and Site Inspection for CP Related Information in KIPC-Dungun Water Supply Project. 1998
Underground pipeline at Tuanku Jaafar Industrial Estate (NPS 2.5”, 3” : 240m, 240m). 1998
Oxygen Reticulation Pipeline from Bukit Raja Industrial Estate, Klang to Nippon Electric Glass (NEG), Lion Industrial Park, Shah Alam. 1999
Ro carry out rectification works on low potential CP at Shah Alam. 1998
TITAN OSL Pipeline and Terminal Expansion. 1999
Pan Century Edible Oil. 1999
Titan Polyethylene 100 KTA HDPE Plant. 1999 
NGDS Pipeline Phase I & II, Gebeng Industrial Area, Kuantan. 1999
Natural Gas Distribution System to Kemuning Industrial Area. 1999
Tanjung Langat, Pasir Gudang, Johor. (NPS 6” Dia / 140m) 1999
Peninsular Gas Utilisation Project Stage III – Sector 2 & 3 Gas Transmission System for The Engineering, Procurement, Construction and Commissioning (EPCC) of the Gelugor Mainline. Pending
The Construction & Completion of the proposed Mukah Water Supply Raw Water Resource Development Phase 1, Mukah District, Sibu Division. 2001
Consultancy service for the design and installation of CP at various locations. 1999
Second Gas Pipeline for Bintulu Power Station, SESCO, Sarawak. (NPS 12” – 3.5km) 2000
Auditing of CP Sacrificial Anode System for Malaysian Oxygen Berhad (MOX), underground pipeline. 1999
The Supply, Delivery, Laying and Commissioning of the Proposed 1000mm/600mm diameter Steel Pipeline and Associated Works from around Mile 7 to City Centre/Simpang Tiga, Kuching Division. 2000
CIPS with Global Positioning System for Miri Distribution System at Miri, Sarawak. 2000
CIPS with Global Positioning System and Pipe to Soil Potential Data Logging Activity at Test Posts for Selected Areas of PGU III Gas Pipeline System. 2000
Propane Dehydrogenation Project at Gebeng, Kuantan.i)  BPC – 2 x 2” Sch 40 Pipe

ii) BPC – 1 x 6”Sch 40 Pipe

2000
Kertih Centralised Tankage Facility Project, Phase 2 – EPCC of CP System for Storage Tanks. 2000
CP Rectification Work for Prai Industrial Area. 2000
CP System for NPS 4” Æ/986m Underground Ethylene Vapour Line at Pasir Gudang, Johor. 2000
Projek Express Rail Link Kuala Lumpur – KLIAERL/Crossing with MPP 2000
Kerteh LDPE Project – Cathodic Protection System 2002
Supply, Delivery, Laying, Testing & Commissioning of 750mm Dia. Steel Pumping Main From Demak Laut Industrial Estate to Pending Industrial Estate, Kuching. 2001
Proposed 10” Underground Nitrogen Pipeline in Kulim Hi-Tech Park, Phase II, Kerteh. 2001
CP System for Gebeng, Pahang. (NPS 4” Æ/700m) 2000
Projek Express Rail Link Kuala Lumpur – KLIAERL/Crossing with MPP and Petronas Gas Pipelines 2001
CP System Repair/Rectification of TPP1 Cathodic 3” Underground Propylene Piping “Shorting” Problem. 2001
Projek Express Rail Link Kuala Lumpur – KLIAERL/Crossing with Petronas Pipelines 2001
Proposed 900mm/700mm Æ Steel Pipeline from Jalan Airport/Jalan Stutong Junction To Samajaya, Kuching, Sarawak. 2001
CP System for Philip Morris, Seremban 2, Negeri Sembilan- NPS 8”/5040m, NPS 6”/60m & NPS 4”/50m 2002
Supply, Install & Commissioning for CP System in Jalan Pekeliling, Pasir Gudang. 2000
Carry Out the Potential Measurement for All Jetties Piles, SBM, Jetty Pipes Lines, TNB Fuel Oil Line & the LPG Bullets to Confirm the Reliability of the Shell Refining CP System. 2000
Supply, Engineering Design, Soil Resistivity Test, Installation, Commissioning & Report of CP system for the Underground LPG Tank at Gurney Drive, Penang.  2000
Supply, Engineering Design, Soil Resistivity Test, Supervision of Installation, Testing, Commissioning & Report for CP System of Underground Pipeline at Pasir Gudang. (NPS 2” Dia. – 900m) 2000
CIPS with Global Positioning System for Lateral Gas And GPP Interconnecting Pipelines At Kerteh, Terengganu Darul Iman. 2001
Sacrificial Anode Protection System to Replace Deteriorated Anodes Covering An Estimated 7.5km length of Pipeline Lateral to Sunway Keramo. 2001
Rehabilitation of Fuel Oil Unloading Jetty at Sultan Iskandar Power Station, Pasir Gudang. (CP system) 2002
Pipeline Insulating for CP System at Pasir Gudang. 2002
Concrete Pipe Repair for Shell Terminal – Sandakan 2002
Projek Express Rail Link Kuala Lumpur – KLIA- Rectification of Petronas Pipeline Crossing, Section 5 Bridge 47a

– PGB Pipeline Recoating at ERL Bridge 47a Crossing

 

2001
CP System for Underground Fuel Gas Pipeline at Teluk Gong, Melaka. 2001
CP System for 600mm Dia. M.S. Pipe Cum Ancillary Works Along the New Proposed Salim to Airport Road, Sibu. 2003
Gas Pipeline Investigation Works for Grand Hyatt Duta, Stage 1, Kuala Lumpur. 2002
CIPS & DCVG Services from Sedenak – Plentong 2002
Inspection for TNB Generation, Sultan Iskandar Power Plant Underground Gas Pipeline, Pasir Gudang.(4 surveys per year) 2002up-to-date
Investigation and Modification Works for Anode Open Potential at 23 Test Posts at GMSB KL Branch.  2002
CIP with GPS for NPS 30 Gas Pipeline from Segamat to Sedenak and Connaught Bridge Lateral (176km) 2002
DCVG Survey with GPS Coordinate System at PGU III Pipeline System and Related Work at Kulim. 2002
CP System for Petronas Petrochemical Administration Complex, Kerteh, Kemaman. 2003
Preventive Maintenance Monitoring of CP System for Underground Pipeline for Year 2003. 2003
CP System for EPCC of NGDS to Batu Caves FL1/DL1, Selangor. WIP
CP Impressed Current System for Batu Berendam, Melaka. 2003
CP System for Gas Malaysia Putrajaya, Precint II.(NPS 4ӯ-2,550m) & 5 nos. pipe riser. WIP
CP System for Proposed 700ND MSCL Pumping Main from Batu Kitang WTP to Bau under the Tasik Biru-Lundu-Sematan Regional Water Supply, Kuching, Sarawak. 2003
CP System for Pipeline Extension at Batu Berendam, Melaka  2003
ICCP System for Kulim Power Station, Kulim, Kedah. 2003
DCVG & CIPS for PGU I & PGU II Sector 1 at Kerteh, Telok Kalong & Gebeng. 2003
DCVG gpt PGU II Sector III Pipeline System gtom ML300, Segamat to ML305, Kluang. 2003
Zinc Plating on Metal Contact & Relevant Pipeline Corrosion Protection Work. 2004
Impressed Current CP System for N2 Line to Penfibre, Prai, Penang. 2004
CP System For N2 Line to Penfibre, Prai 2004
EPCC for Upgrading of Impressed Current Cathodic Protection Groundbed for Kerteh City Gate, PGU I, Kg. Chabang, Terengganu Darul Iman. 2004
Supply, Install, Testing & Commissioning of T/R of CP System for Tanks D960, D990 & rectification of T/R for D927 at KR-1, Kerteh. 2004
CP System for The Existing 750mm steel pipeline along Jalan Bako from Bukit Sioal to Bukit Andau, Kuching, Sarawak. 2004
Direct Current Voltage Gradient (DCVG) Survey for MOX Gases Bhd’s Underground Pipeline 2004
CP Impressed Current System for N2 Pipeline, Pasir Gudang, Johor 2004
CP Impressed Current System for H2 Pipeline, Pasir Gudang, Johor 2004
Provision of Onshore Pipeline Protectrion Work For Petronas Carigali Sdn Bhd, Sarawak Operation 2004
Rehabilitation of CP System for Underground Pipeline at Penang 2004
Yearly Inspection & Monitoring of CP System for Jetty Steel Piles & Underground Buried Pipeline 2004
Direct Current Voltage Gradient (DCVG) Correlation and Coating Repair at Selected Locations of PGB Gas Pipeline PGU II Sector 3 and PGU III Sector 1. 2004
Rectification of CP for Optimal, Kerteh 2005
The Supply, Delivery, Laying and Commissioning of The Proposed Main Extension of the System Agihan Bandar Baru, Sibu 2005
CP for MTBE, Gebeng Kuantan 2005
Impressed Current System for New Pipeline to MSG Pasir Gudang 2005
–   DCVG with GPS for PGU 2 Sec 2 & Loop 2 and PGU 3 Sec 1-   Correlation & Coating Repair WIP
CP System for Proposed 1100mm (N.D.) Steel Pipeline Including All Associated Works from Jalan Matang / Jalan Batu Kawa Junction to Bukit Siol WIP
Rectification of Existing CP System for Gas Pipeline at Kluang, Johor 2005
Rectification of Existing CP System for Gas Pipeline at Teluk Kalong & Gebeng Industrial Area, Kuantan Pahanf 2005
Rectification of Existing CP System for Gas Pipeline at Sentul, Kuala Lumpur 2005
CP System for EPCC of the NGDS to Sungai Buloh FL Stage 2/06 Sungai Buloh, Selangor DE 2006
Cadangan Pembinaan Kolam Takungan dan Pemasangan Paip Air Pulau Jerejak, PenangKontrak No. 1 – Pembekalan dan Pemasangan Paip Berkeluli Dasar Laut Berkembar 900mm ND Sepanjang 1km Dari Lebuhraya Bayan Baru ke Pulau Jerejak

– Cathodic Protection System

2006
Engineering, Procurement, Construction & Commissioning of NGDS to Semenyih FL Stage 1/05, Sg. Lalang, Semenyih, S’gor- Cathodic Protection System WIP
CP System for NGDS to Pulau Indah – West Post FL Stage 1/05, Pulau Indah, Port Klang WIP
Bekok Raw Water Transfer Scheme- Soil Resistivity Survey for Cathodic Protection 2006
CP System for N2 Pipeline at Kulim 2006
Rectiofication of Existing CP System for Gas Pipeline at Prai Industrial Area & Kulim Hi-Tech Park 2006
Proposed Jetty Structure Assessment at Te\luk EWA Terminal for Lafarge Malayan Cement Plant 2006
Recitification of CP Sytem for Gas Pipeline at Kluang, Johor 2006
ICCP System for the Existing 800mm dia Watermain from Nyabau Water Treatment Plant to Tanjung Kidurong Area, Bintulu, Sarawak WIP